Alaskan Way Viaduct Park

proposal for site development analysis and design by Richard B. VanDeMark

Written in English
Published: Pages: 57 Downloads: 858
Share This

Subjects:

  • Parks -- Washington (State) -- Seattle -- Designs and plans

Edition Notes

Senior project, Dept. of Horticulture and Landscape architecture, Washington State University.

Other titlesAlaskan Way Viaduct Park, Seattle, Washington :
StatementRichard B. VanDeMark, Charles D. Watson.
GenreDesigns and plans.
ContributionsWatson, Charles D.
The Physical Object
Pagination57, 6, [5] p., [1] leave of plate :
Number of Pages57
ID Numbers
Open LibraryOL17601694M
OCLC/WorldCa48137579

  The entire Alaskan Way Viaduct is coming down, its cement (unlike the substance in my souvenir) will be reprocessed and used for infrastructure elsewhere, perhaps to pave a surface roadway on the waterfront, a bicycle path or pedestrian walkway.   Books. Film and TV. A toll sign on a ramp leading to the tunnel that will replace the Alaskan Way Viaduct is shown near T-Mobile Park, Wednesday, Jan. 9, , in Seattle. The Alaskan Way. On Monday, the Seattle Department of Transportation (SDOT) released the Final Environmental Impact Statement (FEIS) for the new, post-viaduct Alaskan Way and accompanying promenade along the waterfront. It shows us our future along the waterfront: a massive roadway, nine lanes in parts, separating our city from its waterfront in much the same way that the Viaduct separates Author: Ryan Packer. The Alaskan Way Viaduct runs past downtown Seattle, with the Space Needle visible to the north. Photo: Karen Ducey/Seattle Post-Intelligencer Viaduct vote reflects a city at a crossroads.

  West Seattle news, 24/7. More changes to traffic flow in the south end of downtown as Alaskan Way Viaduct demolition continues. Since that area’s become an increasingly important pathway to/from. Alaskan Way crowded with trains, vehicles, and pedestrians, Seattle, Courtesy Seattle Municipal Archives () Alaskan Way Viaduct, Seattle, May 2, Courtesy Seattle Municipal Archives (). Building the park will also hinge on the demolition of the Alaskan Way Viaduct. The overpass is set to be torn down in , shortly after the new Highway 99 Tunnel is scheduled to : Bill Lucia. The Alaskan Way Viaduct closed for good Friday. If you’re planning to use a park-and-ride at a transit station or stop be aware Android) or call to book a ride to and from.

South Park Investments; Alaskan Way Viaduct Closes on January 11 Update on South Park Work to Address Community Task Force Recommendations and Other Investment in South Park Here’s a follow up to an update earlier this year about implementation of the recommendations of the South Park Public Safety Task Force, and other projects in South Park. The Alaskan Way Viaduct Program and NPS worked together to create a HAER record (pdf kb) for the Alaskan Way Viaduct. The record consists of a narrative description and a series of photos which include the pictures below. The large format HAER photographs were taken by renowned National Park Service photographer Jet Lowe in   The Alaskan Way Viaduct is coming down, and a vast new park system is coming up. Seattle’s empty Alaskan Way viaduct with a light coating of snow in February The city sometimes becomes deserted during bad weather, but .

Alaskan Way Viaduct Park by Richard B. VanDeMark Download PDF EPUB FB2

Alaskan Way Viaduct Park: Proposal for site development analysis and design Unknown Binding – January 1, by Richard B VanDeMark (Author) See all formats and editions Hide other formats and editions.

Enter your mobile number or email address below and we'll send you a link to download the free Kindle App. Author: Richard B VanDeMark. The Alaskan Way Viaduct has been demolished in the year since the tunnel opened.

Seattle’s central waterfront has transformed, both visually and audibly - it’s hard to describe how much quieter it is to walk along the water today without two decks of highway traffic roaring overhead.

The tunnel opened to State Route 99 traffic on Feb. 4, following a weekend grand opening celebration, where the public had an opportunity to walk through the tunnel and learn more about the plans for Waterfront Seattle, a public park that will be developed along the site of the viaduct.

The Alaskan Way Viaduct Replacement Program is led by the. preferred way forward to put together the case for developing the park and retaining Alaskan Way Viaduct. Now entitled Initiative, the project to preserve a part of Seattle’s history and provide a unique facility for the city’s community is set to be considered for approval in summer ALASKAN WAY VIADUCT SEATTLE, WASHINGTON, USA.

Alaskan Way Viaduct Park. likes. Community. Facebook is showing information to help you better understand the purpose of a ers: The Alaskan Way Viaduct, an elevated section of State Route 99 in Seattle, was built in the s, and decades of daily wear and tear took a toll Alaskan Way Viaduct Park book the structure.

Because of the viaduct’s age and vulnerability to earthquakes, replacing it was critical to public safety. The ramps connecting from SR 99 to Alaskan Way should be designed to calm traffic and signal to the motorist that they are entering the city. The role of Alaskan Way as a grand boulevard and linear open space of citywide significance that connects a diversity of districts along the waterfront should be recognized.

Size: 1MB. Waterfront Seattle will rebuild Alaskan Way from S King to Pike streets, and build a new street, known as Elliott Way, from Pike to Bell streets. The new surface street will span a total of 17 blocks from Pioneer Square to Belltown, with two lanes of.

The Alaskan Way Viaduct has been an eyesore along Seattle's waterfront since the s. But over the next couple of years, that will all change. Alaskan Way started as a rail yard to accommodate the City's industrial needs along the waterfront of Elliot Bay in the s. As the need for rail decreased with the rise of personal automobiles, the City built the elevated viaduct over the rails innamed it State Route 99 and launched a major north-south thoroughfare in Seattle.

Today, traffic on the Alaskan Way Viaduct. Construction of Alaskan Way Viaduct begins. April 4, Completion of Alaskan Way Viaduct Febru Nisqually Earthquake badly damages viaduct and Alaskan Way Seawall. Emergency repairs cost WSDOT $ million.

Debate on what viaduct replacement should be. Alaskan Way Viaduct's Two-Week Vacation Starts April Last week we found out WSDOT and Seattle Tunnel Partners were going to need to close the Alaskan Way viaduct for two weeks while Bertha dug.

WSDOT has long said that there'd be a public goodbye/hello party of some sort on the Alaskan Way Viaduct and in the new Highway 99 tunnel before it opens for use.

This morning, the details are out. Now, the Alaskan Way Viaduct is going away. The viaduct, the last remaining mile stretch of this city’s elevated highway through downtown, has been a sublimely ugly and stoutly utilitarian. The Alaskan Way Viaduct was closed on Jan. 11, after six decades of carrying drivers through Seattle’s waterfront.

The transformation has. VIADUCT: This is a good day to not leave home, period. The biggest reason: The Alaskan Way Viaduct is closed most of the day for the Rock N Roll Seattle Marathon. 4 am to 4 pm — the hours may wind up varying somewhat, but that’s the original warning, both directions.

WESTWOOD VILLAGE: One way to avoid leaving the area is to enjoy activities like today’s. SR Alaskan Way Viaduct Replacement Project July Historic, Cultural, and Archaeological ResourcesDiscipline Report 1 Final EIS Chapter 1 INTRODUCTION AND SUMMARY Introduction This discipline report was prepared in support of the Final Environmental Impact Statement (EIS) for the Alaskan Way Viaduct Replacement Project.

File Size: 9MB. Alaskan Way Viaduct looking north, Seattle, ca. Courtesy UW Special Collections (SEA) Hillclimb from Pike Place Market to the waterfront, Seattle, Courtesy Seattle Municipal Archives () Alaskan Way Viaduct at Marion Street, Seattle, s.

Photo by Paul Dorpat. Alaskan Way Viaduct, southern extension, Seattle, s. Architect Kevin Peterson describes Alaskan Way elevated park space in Seattle. More at Alliance for Pioneer Square is challenging what it calls an “eight-lane highway” proposed to handle increased traffic along Seattle’s central waterfront, after the Alaskan Way Viaduct comes.

The final piece of the Alaskan Way Viaduct along Seattle's waterfront was torn down this week, and now we're taking a look at the dramatic transformation of the waterfront. There are buildings. LOCAL COLUMNISTS HAVE FLOATED the idea for years: Salvage part of the Alaskan Way Viaduct and convert it into public green space, a la New York City’s High Line.

The High Line is Manhattan’s urban wonder park. The nearly mile-and-a-half-long rehabbed railroad winds through Chelsea, the Meatpacking District, and Hell’s Kitchen. The Washington Department of Transportation announced that Seattle's Alaskan Way Viaduct will close permanently in Januarywith service switching over the tunnel Bertha built.

The previous plan expected the switch to occur in the Fall. Viaduct closure draws sentimental goodbyes to a Seattle landmark It's a short matter of time until the Alaskan Way Viaduct is gone for good. On Thursday, some Seattleites stopped by to.

SEATTLE -- The SR 99 tunnel is scheduled to open this fall and crews will begin to remove the Alaskan Way Viaduct in These changes will be. TRANSFORMING SEATTLE’S WATERFRONT.

The City of Seattle is rebuilding Seattle’s central waterfront. Now that the Alaskan Way Viaduct removal is complete, the City is constructing a park promenade along the water, building a new surface street along Alaskan Way, rebuilding Pier 58 and P building an elevated connection from Pike Place Market to the waterfront.

Alaskan Way, originally Railroad Avenue, is a street in Seattle, Washington, that runs along the Elliott Bay waterfront from just north of S. Holgate Street in the Industrial District—south of which it becomes East Marginal Way S.— to Broad Street in Belltown—north of which is Myrtle Edwards Park and the Olympic Sculpture right-of-way continues northwest through the park, Location: Seattle, Washington, US.

The Alaskan Way Viaduct Replacement Project is one of several independent projects developed to improve safety and mobility along SR 99 and the Seattle waterfront from the South of Downtown (SODO) area to Seattle Center. Collectively, these individual projects are referred to as the Alaskan Way Viaduct and Seawall Replacement Program (the Program).File Size: 2MB.

Originally the idea was to build the elevated park similar to New York City's High Line Park, on the existing Alaskan Way Viaduct. The viaduct is scheduled to be demolished once the replacement Author: Marc Stiles. Inthe elevated freeway, the Georgia Viaduct, was built to circumvent the tidal waters, rail lines and industries below.

This was replaced in by the twin elevated freeways: the Georgia Viaduct and the Dunsmuir Viaduct as part of a freeway plan drafted during the public love for the freeway in the middle of the 20th century to connect the Eastern Core to downtown Vancouver.

Initiative would create a public development authority to plan a one-mile elevated park — or “garden bridge” — incorporating a small, restored portion of the Alaskan Way Viaduct. Road Requiem. Viaduct Celebrations Make Way for New SR 99 Tunnel Seattle pays homage to the Alaskan Way Viaduct and welcomes its replacement.

By Gwen Hughes 2/1/ at am. The former on-ramp to the Alaskan Way Viaduct has completely receded from my view and the mass of rubble and rebar that remains is a reminder that Seattle is embarking on a once-in-a-lifetime.